The SG-1 comprises two types of system chassis: 1U and 10U. The 1U chassis (or Mini System Chassis) has 2 service creation slots and 1 power supply slot built into the chassis. The 10U chassis (or Full-Size System Chassis) has 16 service creations slots and 4 power supply slots for load sharing redundancy (see Figure 1-1).

Figure 1-1. SG-1 10U

BEFORE YOU BEGIN

Before installing the SG-1 chassis and its associated modules, it is important to prepare for installation by:

Preparing the site (site preparations) and reviewing the installation plans.

Establish a Method of Procedure (MOP).

Unpacking and inspecting the system components.

Gathering the tools to properly install the SG-1 chassis and its associated modules.

SITE PREPARATIONS

Typically, you should have prepared the installation site beforehand. As part of your preparation, obtain a plan of the site or Telco environment where the SG-1 chassis will be installed. All personnel involved in the installation of the SG-1 chassis, including installers, engineers, and supervisors, should participate in the preparation of a MOP for approval by the customer.

Method of Procedure

An example of a pre-installation checklist of tasks and considerations (Method of Procedure) that needs to be addressed and agreed upon before proceeding with the installation is given below:

Assign personnel.

Determine protection requirements for personnel, equipment, and tools.

Evaluate potential hazards that may affect service.

Schedule time for installation.

Determine any power and space requirements.