Cisco Systems Cisco uBR10012 manual Ground connection and disconnection, IN-11

Models: Cisco uBR10012

1 304
Download 304 pages 40.3 Kb
Page 303
Image 303
3-28
1-xiv
1-xii,1-1,2-2
3-28
3-28
2-3,3-23
3-24
3-23

Index

tools and supplies for connecting the chassis ground 3-23,3-26

tap manufacturers

D-1, D-3

 

TCC+ card

 

 

 

captive screws (figure)

5-36

description

1-36

 

 

external clock reference source 1-26

faceplate (figure)

1-26

 

installing a blank cover in an empty slot 5-37

LEDs (table)

1-27

 

technical assistance information 4-2

Telnet connection

4-4

 

temperature

 

 

 

requirements

2-6

 

 

warning messages

2-5

 

terminal server connections

3-62

terms and acronyms

1-xix

 

Timing, Communication, and Control Plus card, see TCC+ card

tools and supplies

 

 

 

 

connecting DC power

3-29, 3-32, 3-49

connecting ground

3-26

 

for maintenance and replacing modules 5-2

transmission distance, fiber-optic

2-9

troubleshooting

4-4

 

 

 

console port

4-5

 

 

 

cooling subsystems

4-2, 4-11

 

DC PEM

4-7, 4-8

 

 

 

Ethernet connections

4-4

 

fan assembly module

5-7

 

identifying startup problems

4-6

line cards

4-12

 

 

 

overview

4-2

 

 

 

 

power subsystem

4-8

 

power supply

4-2

 

 

 

processor

4-2

 

 

 

 

startup problems

4-6

 

 

turning off

 

 

 

 

 

AC PEM (figure)

5-22, 5-27

 

DC PEM (figure) 3-6,5-9,5-14second DC PEM (figure) 5-18

typical 19-Inch equipment rack posts and mounting strips (figure) 2-11

typical interfaces found on a Cisco uBR10012 router (table) 3-64

U

upconverter manufacturers D-1,D-3upgrading to an HHGE line card 5-59

V

vector signal analyzer manufacturers D-2,D-4

W

warnings

AS/NZS 3260 installations 3-1blank faceplates 5-31,5-37,5-42,5-62class 1 laser 1-36,1-38,1-41,1-42,3-55,5-39connecting to the power source 2-4,2-7,3-28

connecting units to the supply circuit

3-28

disposal 1-12, 1-20

 

ground connection and disconnection

3-25

more than one power supply connection 5-2mounting the chassis

never defeat the ground conductor overcurrent

preventing injury while lifting the chassis qualified personnel 2-2

remove power from the DC source 3-28,5-8,5-14,5-19remove the tape from the circuit breaker switch 5-12restricted access 2-5

secure power cabling

trained and qualified personnel translated

two-pole disconnect device

 

 

Cisco uBR10012 Universal Broadband Router Hardware Installation Guide

 

 

 

 

 

 

 

OL-18259-01

 

 

IN-11

 

 

 

 

 

Page 303
Image 303
Cisco Systems Cisco uBR10012 manual Ground connection and disconnection, IN-11