2-9
Installation and Configuration Guide for the CiscoWorks Wireless LAN Solution Engine
78-15903-01
Chapter2 Preparing to Install the CiscoWork s 1130 Wireless LAN Solution Engine Preparing Your Site for Installation
Preparing Your Site for Installation
This section describes the requirements your site must meet for safe installation
and operation of your WLSE. Ensure that your site is properly prepared before
beginning installation.

Environmental

When planning your site layout and equipment locations, keep in m ind t he
precautions described in this section to help avoid equipment failures and reduce
the possibility of environmentally caused shutdowns. If you are currently
experiencing shutdowns or unusually high errors with your existing equipment,
these precautions will help you isolate the cause of failures and prevent future
problems.
Use the following precautions when planning the operating environment for your
WLSE.
Always follow the ESD-prevention procedures described in the Preventing
EMI, page 2-8 to avoid damage to equipment. Damage from static discharge
can cause immediate or intermittent equipment failure.
Make sure that the chassis cover is secure. The chassis is designed to allow
cooling air to flow effectively within it. An open chassis allows air leaks,
which could interrupt and redirect the flow of cooling air from internal
components.
Electrical equipment generates heat. Ambient air temperature might not be
adequate to cool equipment to acceptable operating temp erat ures w ith out
adequate circulation. Make sure that the room in which y ou opera te ha s
adequate air circulation.

Choosing a Site for Installation

Warning
This unit is intended for installation in restricted access areas. A restricted
access area is where access can only be gained by service personnel through
the use of a special tool, lock and key, or other means of security, and is
controlled by the authority responsible for the location.
Statement 1017