EPSON AcuLaser C1100 Revision B

TROUBLESHOOTING Procedure for troubleshooting 123

3.1.5 Warming-Up Flowchart at Power-ON

The following flowchart (outline) shows the printer’s warm-up operation, from power-on to when the printer is ready to print.

Figure 3-2. Warming-up flowchart at power-on

Leg_Sec001_031FA
Power ON
Error displayed?
When Deve Home Position
Sensor Error occurs:
Go to “FIP-1.46”
When an ID Error occurs:
XERO Go to “FIP-1.9”
Y Toner Go to “FIP-1.13”
M Toner Go to “FIP-1.17”
C Toner Go to “FIP-1.21”
K Toner Go to “FIP-1.25”
When Deve Home position
Sensor Error occurs:
Go to “FIP-1.46”
PLC sequence
*3
(30 secs or more)
*1 : Rotary rotates 360º plus a little more during
Home Position correction and 720º during
execution of the PLC sequence.
*2 : By ADC TC correction, the target density
value of TC is being corrected according
to the developing machine drive time.
*3 : The PLC sequence creates and reads ADC
patches to adjust toner and image density.
Yes
No
Error recovery processing
(See “List of Errors and Warnings”)
When IBT CLN Fail occurs
Go to “FIP-1.54”
Fuser warm-up
(time out within 45 secs)
Heater red-hot
When IBT CLN Fail occurs
Go to “FIP-1.61”
Total 37 to 840 seconds
(depending on ambient environment)
End of cleaning
and FUSER warm-up?
Yes
No
Ready (ready to print)
BTR/IBT cleaning
(11 secs)
IBT Brush Motor operation
Yes
Yes
No
No
Fuser temperature
at Power ON lower than the Fuser
temperature threshold
value?
Detected value
of temperature sensor of a fixed
difference with value at previous
printing?
MOT ASSY ROT operation
*1
CRUM check and ADC TC target
density value correction
*2
(16 secs)
MOT ASSY ROT operation
*1
Rotary operation check and
Home Position correction
(8 secs)
IBT Brush Motor operation