SJ200 Inverter
Uncover the Inverter Vents
Step 8: After mounting and wiring the inverter,
8 remove any covers from the inverter housing. This includes material over the side ventilation ports.
WARNING: Make sure the input power to the inverter is OFF. If the drive has been powered, leave it OFF for five minutes before continuing.
Ventilation holes
(top)
Ventilation holes
(both sides)
Powerup Test
Step 9: After wiring the inverter and motor, you’re ready to do a powerup test. The
9 procedure that follows is designed for the
•You have followed all the steps in this chapter up to this step.
•The inverter is new, and is securely mounted to a
•The inverter is connected to a power source and motor.
•No additional wiring of inverter connectors or terminals has been done.
•The power supply is reliable, and the motor is a known working unit, and the motor nameplate ratings match the inverter ratings.
•The motor is securely mounted, and is not connected to any load.
Goals for the Powerup Test
If there are any exceptions to the above conditions at this step, please take a moment to take any measures necessary to reach this basic starting point. The specific goals of this powerup test are:
1.Verify that the wiring to the power supply and motor is correct.
2.Demonstrate that the inverter and motor are generally compatible.
3.Get an introduction to the use of the
The powerup test gives you an important starting point to ensure a safe and successful application of the Hitachi inverter. We highly recommend performing this test before proceeding to the other chapters in this manual.