Index

L

leaks ECD, 189

FPD with EFS, 198 FPD without EFS, 199 packed column inlet, 160 pressure checking, 217 split/splitless capillary inlet, 165 valves, 216

LED display, 33

lighting problems, FID, 177

liners, 17 care of, 169 detector, 22 installation, 24 metal, 171

lock keyboard, 38

M

metal capillary columns, 30

N

noise problems, 204

NPD, 178 cleaning, 178

jet replacement, 30 on•columntest chromatogram, 234 replacing collector, 181

split inlet test chromatogram, 231 test chromatogram, 226

nuts, 14

O

o-rings, 14

oven, 11 isothermal, 49

programming temperature, 49, 117 safety, 51

status, 50

temperature calibration, 54

P

packed column inlet, 100, 159 changing septum, 159 cleaning, 162

leaks, 160

packing columns, 158

peak problems deformed peaks, 211 extra peaks, 209 inverted peaks, 209 no peaks, 209

power fail, 53 INET, 37

pressure, initial column, split/splitless capillary, 110

pressure check, 217

preventive maintenance, 156

R

radioactivity leak test, ECD, 192

retention time problems drift, 207

wander, 207

243