
Chapter 8---Software and Protocol
Import Configuration |
| |||
Start SEND TEXT Upload from | ||||
Host on Serial PORT | A | |||
|
| |||
|
| |||
Abort |
=================================
6.Windows TERMINAL: Transfers + Send Text File....
6.1Directories - set directory to desired upload directory (C:\TEMP)
6.2File Name: - Type desired File Name (for example: import1.txt)
6.3Select OK with mouse or press Enter key (upload begins)
6.4Verify TERMINAL screen shows status line at bottom:
Stop, Pause, “% complete bar”, Sending: EXPORT1.TXT
6.5Data transfer will continue until complete or an error occurs or the User Aborts: Expect 10 minutes to import 20 sources (500,000 bytes) at 9600 baud.
6.6 At successful end, TERMINAL will remove the bottom line.
7. Model 250 Menu:
When the projector detects the successful end of the transfer the following screen is displayed:
=================================
Import Configuration | |||
IMPORT | COMPLETE | ||
New Configuration is active | |||
|
| ||
- Press | ESC to Continue |
=================================
Press ESC to exit the projector Import operation and return to the Maintenance Menu. There is a 10 second pause before the screen is redrawn.
8.USER ABORT:
Windows TERMINAL: FIRST press STOP to end the Host Upload transfer.
Model 250 Menu: THEN press ESC to abort the projector Import operation.
=================================
Import Failed |
| |||||
IMPORT ABORTED | BY USER | |||||
Old | Data | was | Restored. | |||
- STOP | Host | SEND DATA, | ||||
THEN | Press ESC |
|
|
=================================
Model 250 Service Manual |