DEFINITY Enterprise Communications Server Release 6
Maintenance for R6vs/si
555-230-127 Issue 1
August 1997
Maintenance Commands and Trouble-Clearing Aids

Page8-384test shadow-link

8
Output
The following output example is for the test shadow-link command. The
responses display on a test-by-test basis with one line of data for each test result.
1. If no alarms are registe red against the maintenanc e object then the test seq uence is run only once. T he
long
clear
option forces a clear of all alarms if no errors are encountered during testi ng. The
short clear
option only
clears alarms pertinent to tests in the short sequ ence.
2. Refer to the Report Scheduler an d System Printer feature specifi cation for more details.
Action/Objec
t Qualifier Qualifier Description Permissions Defaults Feature
Interactions
test
shadow-link short |
long
repeat
number
clear
schedule
Both the short and long tes t
sequence execute only Test #318.
How many times each test in the
sequence is repeated (1-10 0)
This option causes the test
sequence (short or long) to repeat
until the alarm (if any) is cleared or
a single test in the sequen ce fails.1
Command is validated and the n a
scheduling form displays to
schedule execution of the
command. The command is then
placed in the command queue and
is executed at the specifie d time.
The information displayed by th e
command is sent to the sys tem
printer instead of the s creen.2
Examples:
test shadow-link l
test shadow-link sh r 2
test shadow-link sh r 2 sc hedule
test shadow-link c
init
inads
craft
Test
Sequence
= short;
Repeat = 1
none
test shadow-link
TEST RESULTS
Port Maintenance Name Alt. Name Test No. Result Error Code
SHDW-LNK 318 PASS
Command Successfully Completed