NEC NEAX2400 system manual Post Installation Test, How to Check Fusion Link by LEDs on FCH Card

Models: NEAX2400

1 213
Download 213 pages 13.1 Kb
Page 148
Image 148
CHAPTER 6 POST INSTALLATION TEST

CHAPTER 6 POST INSTALLATION TEST

This chapter covers how to perform installation tests focusing on the Fusion Call Control Signal (denoted in the remainder of this manual as FCCS) connections, after hardware installation and data assignment. This chapter describes the following tests:

How to Check Fusion Link by LEDs on an FCH Card

Repair Procedure When LED Indicates Abnormality

FCCS Network Connection Test

FCCS Alternate Routing Test

Fusion and Non-Fusion Connection Test

At the end of this chapter, the Fusion Link Test Sheet is attached. Make photo-copies of the sheet to record the test results.

In this chapter, explanations are given using the following network numbering as an example.

 

 

NodeB

 

 

(other Node)

NodeA

 

STNB

(self-Node)

 

 

 

 

 

TELN: 420000

 

 

STN: 2000

STNA

FUSION Network

 

FCCS

 

 

Link

 

 

Fusion

 

TELN: 410000

 

 

STN: 2000

 

 

FCCS: Fusion Call Control Signal

STN: Physical Station Number

TELN: Telephone Number

Figure 6-1 Fusion Network

Note: The Individual Trunk Access feature is not available for Fusion Trunks. To seize a specific Fusion Trunk, use the MBCT command to make busy trunks which are not being tested. This command leaves the Fusion trunk to be tested in an idle state.

1.How to Check Fusion Link by LEDs on FCH Card

Before performing the Fusion link test, be sure to check the Fusion Link LEDs. Refer to Figure 6-2. When the Fusion link is established, the LYR lamp lights green on the FCH (PA-FCHA) circuit card. However, if it re- mains off, the layer 2 (Link Layer) is not established. If this is the case, follow the repair procedure listed here.

ND-70185 (E)CHAPTER 6

Page 133

Revision 3.0

Page 148
Image 148
NEC NEAX2400 system manual Post Installation Test, How to Check Fusion Link by LEDs on FCH Card