POST INSTALLATION TEST
FCCS Network Connection Test
3.43-party Conference Trunk Function Test (via FCCS)
Perform the
STEP 1: Using the MBTK Command, make busy all
Check
STEP 2: Establish a
STEP 3: STN A goes to Switch Hook Flash (SHF), and after hearing SPDT, dials the Telephone Number of STN C in other node (Node B).
STEP 4: STN C answers the call.
STEP 5: STN A, after a brief talk with STN C, makes a SHF, and confirms that a
STEP 6: Release the call.
STEP 7: Repeat the above steps for all CFTs.
STEP 8: Using the MBTK command, cancel the
Node A |
| Node B |
SHF |
|
|
+ | RBT, |
|
TELN: 420000 |
| |
| SPDT |
|
LC |
| LC |
STN A | FCCS | STN C |
TELN: 410000 |
| TELN: 420000 |
STN: 2000 |
| STN: 2000 |
| RG | |
LC | C |
|
|
| |
STN B | F |
|
TELN: 410001 | T |
|
STN: 2001 |
| |
TSW / MUX Card |
|
Figure 6-11 3-party Conference Trunk Function Test via FCCS
Note: When a station activates this feature, CFT in
3.5FCCS Alternate Routing Test
This section explains how to perform the test for
CHAPTER 6 |
Page 142
Revision 3.0