POST INSTALLATION TEST
Fusion and Non-Fusion Connection Tests
4.1 When Seizing a Trunk from a Station
Check
STEP 1: Using the MAT command, make busy all trunks in the route except the trunk to be tested.
STEP 2: Station A in
STEP 3: The call terminates to Station B via FCCS and
STEP 4: Confirm the speech condition is sufficient (no noise, not
STEP 5: Replace the handset of STN A.
STEP 6: Repeat the above steps for all Fusion links.
Check
4.2 When Seizing a Trunk from an ATTCON
STEP 1: The operator at the ATTCON in
STEP 2: The call terminates to Station B via FCCS and
STEP 3: Confirm the speech condition is sufficient (no noise, not
STEP 4: The operator at the ATTCON releases the call by pressing the CANCEL key.