POST INSTALLATION TEST
Repair Procedure When LED Indicates Abnormality
2.3 Test Procedure
STEP 1: Set the MODE switch to 9 (Fusion Link Test) from 8 (standard setting) on the FCH card and initialize the circuit card by turning the MB switch ON→ OFF
(1) Change the mode switch (8 9). FCH card
(2)Initialize the FCH card.
Mode Switch
FCH PA- |
FCHA |
PA- 24DTR
DTI
Mode: 8 9 screw driver
8: standard setting | MB | ATTENTION |
| Contents | |
|
| Static Sensitive |
9: Fusion Link Test Mode |
| Handling |
| Precautions Required |
|
|
|
| (i) UP |
| 0 | 2 | 4 | (ii) DOWN |
|
| 6 |
| |
8 | E | C A . |
| |
|
| |||
|
|
|
|
Front View | Front View |
Note: Be sure to initialize the FCH
Figure 6-5 How to Set the Fusion Link Test Mode
STEP 2: Select an appropriate loopback point by setting the switch (SW01/SW13B).
Select a loopback point by setting the switch.
DTI (PA-24DTR)
OPE
SW00
PCM
FRM
BER
RMT
AIS
SW01 |
To set "Internal Loopback"
4 3
| 2 |
| 1 |
DTI | ON |
|
ATTENTION
Contents
Static Sensitive
Handling
Precautions Required
|
|
|
|
|
|
|
| BL23 | SW01/SW13B |
|
1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 |
|
| |
OFF |
|
|
|
|
|
|
|
| MB |
|
1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 |
|
| |
1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 |
|
| |
OFF |
|
|
|
|
|
|
|
| Payload |
|
|
|
|
|
|
|
|
|
|
|
OFF
Line (External)
Setting a Loopback point......
Internal
Figure 6-6 Loopback Point Designation
STEP 3: When the LYR LED flashes at
ND-70185 (E)CHAPTER 6
Page 137
Revision 3.0