SYSTEM CONFIGURATION
System Considerations
Example: 2 When both FCCS and CCIS links are established between two nodes
Node B |
| Node C |
|
|
|
| |
PC=11 | FCCS |
| 1. xxxx xxxx 0010 1222 |
PC=12 | 4. x0010 1110 10110 1FFF | ||
7. E23C CAAB12 000 0000 | |||
FPC=2 |
| FPC=3 | NEC |
|
|
| Centralized MAT |
| FCCS |
| Fusion |
CCIS |
| CCIS |
|
PC=10 | FPC=4 | Center Node: Node C | |
Node A | Node D |
|
|
Figure 3-15 Centralized Management Report-Fusion (Example 2)
Node A/B/C:Refer to Example 1 on the previous page.
Node D: When Point Code of Node C (12) is assigned to ASYD, SYS 1, Indexes 184 and 185, System mes- sages are sent to Node C using CCIS. When this system data is not assigned (0) and Fusion Point Code of Node C (3) is assigned to ASYDL, SYS 1, Index 532, system messages are sent to Node C using FCCS.
ND-70185 (E)CHAPTER 3
Page 23
Revision 3.0