NEC NEAX2400 Installation, Chapter, ND-70185E, Page Revision, <FCH in PIM0 Pattern 3>

Models: NEAX2400

1 213
Download 213 pages 13.1 Kb
Page 65
Image 65
<FCH in PIM0 (Pattern 3)>

INSTALLATION

Connecting Cables

<FCH in PIM0 (Pattern 3)>

TOPU

PIM 3

PIM 2

FANU

PIM 1

UTP CTG5 ST CA-J

 

CN

 

 

CN

 

CN

CN

CN

CN

PIM 0

CN

 

 

CN

 

 

UTP CTG5 ST CA-D

 

 

 

 

 

HUB

FCH

FCH

HUB

 

 

 

00 01 02 03 04 05 06

 

 

 

 

BSCM

LPM

UTP CTG5 ST CA-J

 

 

 

00 01 02 03 04 05 06

 

 

 

 

 

 

CN

CN

 

 

 

 

 

 

 

BASEU

 

ATTENTION

Contents

Static Sensitive

Handling

Precautions Required

<FCH in PIM0 (Pattern 4)>

TOPU

PIM 3

PIM 2

FANU

PIM 1

UTP CTG5 ST CA-D

CN

 

 

CN

 

CN

CN

CN

CN

PIM 0

 

 

 

 

CN

 

CN

 

 

CN

 

HUB

FCH

FCH

HUB

 

00 01 02 03 04

05 06

BSCM

CN

 

CN

 

 

 

 

 

 

00 01 02 03 04

UTP CTG5 ST CA-J

UTP CTG5 ST CA-J

 

CN

 

 

 

 

 

 

CN

 

 

LPM

 

BASEU

 

 

 

Note: When dual LANIs are used in both slot 00 and 03 of CPR (Pattern 3 or 4), be sure to use at least two HUB cards: ￿ One HUB for internal LANI (in slot 00) and the other for external LANI (in slot 03: available for Release 3 or ￿ later software). However, if this is the case and FCH is also in a dual configuration, the 10 BASE-T “cross” ￿ connection between the HUBs is not required.

Figure 4-13 Examples of Ethernet Cable Connection-FCH in PIM0 (1-IMG System) (2/2)

CHAPTER 4

ND-70185 (E)

Page 50

Revision 3.0

Page 65
Image 65
NEC NEAX2400 Installation, Chapter, ND-70185E, Page Revision, <FCH in PIM0 Pattern 3>, <FCH in PIM0 Pattern 4>