POST INSTALLATION TEST
FCCS Network Connection Test
Make sure that the LYR LED flashes at |
|
|
| |
|
|
|
| FCH |
When the result of test |
|
|
| |
is OK, the LYR LED |
|
| MB | |
flashes. |
|
|
| |
|
|
|
| |
LYR | Flash |
|
| |
|
| EST3 Send | MNT | |
|
|
| ||
Remains ON | LB |
| Receive Polarity of | Mode 8 |
when available |
| EST2 | ||
for Ethernet |
| EST1 | Receive |
|
|
| DTI | ||
|
|
|
| |
|
| EST0 | Link is |
|
|
|
| established |
|
Remains ONLOAD |
|
| FCH | |
when ready to broadcast | Front View |
| ||
data packets | Note |
|
|
|
|
|
|
| Front View |
Note: When the FCH is a “Root Bridge”, the LOAD LED remains ON.
Figure 6-7 Fusion Link-Test Results
STEP 4: Return Mode to 8 (standard setting) when the test is complete.
STEP 5: Initialize the FCH
Note: Be sure to initialize the FCH
3.FCCS Network Connection Test
This section explains how to perform the following connection tests within the Fusion network:
•
•ATTCON Connection Test (via FCCS)
•Line (LC, ELC, DLC card) Connection Test (via FCCS)
•
3.1
Perform the
Check
3.1.1 FCCS Call Origination Test
STEP 1: Using the MBCT command, make busy all trunks in the route except the trunk to be tested.
STEP 2: Lift the handset of STN A in Node A.
STEP 3: Dial a Telephone Number (STN B) which belongs to another node.
CHAPTER 6 |
Page 138
Revision 3.0