SYSTEM CONFIGURATION

Fusion System with FCH

In Figure 3-3LANI, HUB, FCH, and DTI are shown in a fully redundant configuration. This configuration is available for Release 3 or later software.

n this case, LANI, HUB, FCH, and DTI are composed in a fully redundant configuration. Note that this configuration is available for ￿ elease 3 or later software.

CPU#0

CPU#1

LANI#0-A LANI#0-B

LANI#1-A LANI#1-B

....

10 Base T

HUB0

HUB1

....

10 Base T

Redundancy

FCH0

FCH1

DTI

to the same route

DTI

Figure 3-3 Redundant Configuration (LANI, HUB, FCH, and DTI)

In Figure 3-4HUB, FCH, and DTI are shown in a redundant configuration.

CPU#0

LANI#0

....

FCH

DTI

 

10 Base T

10 Base T

 

PCI Bus

HUB

 

 

 

 

 

 

 

 

10 Base T

to the same route

 

 

HUB

 

 

 

 

....

 

 

CPU#1

LANI#1

 

FCH

DTI

PCI Bus

10 Base T

 

10 Base T

 

 

 

 

Redundancy

 

Figure 3-4 Redundant Configuration (HUB, FCH, and DTI)

In Figure 3-5FCH and DTI are shown in a redundant configuration.

In this case, FCH and DTI are composed in a redundant configuration.

CPU#0

CPU#1

PCI Bus

PCI Bus

LANI#0

10 Base T

....

HUB

LANI#1

10 Base T

10 Base T

10 Base T

FCH

 

DTI

 

 

 

 

 

 

to the same route

FCH

 

DTI

 

 

 

 

 

 

Redundancy

Figure 3-5 Redundant Configuration (FCH and DTI)

ND-70185 (E)CHAPTER 3

Page 13

Revision 3.0

Page 28
Image 28
NEC NEAX2400 system manual 4HUB, FCH, and DTI are shown in a redundant configuration