INSTALLATION

Connecting Cables

4.2Connecting 10 BASE-T Cables

Figure 4-11shows sample cable connections, where HUB (PA-M96) cards are provided in a dual configu- ration and the FCH (PA-FCHA) card is located in PIM 1 (1-IMG system/IMG0). When HUB cards are pro- vided in a dual configuration, the two HUB cards must be connected on each front edge connector using a 10 BASE-T cross cable. However, when dual LANIs (LANI-A and LANI-B) are used for each CPU, the cross cable connection between HUBs for FCH#0 and #1 is not necessary.

Note: The Ethernet cables shown in the examples in this section are NOT available from NEC. These cables must be provided by the customer, depending on the system configuration. See “Chapter 6 Connecting 10 BASE- T Cables.”

DTI (PA-24DTR)

FCH (PA-FCHA)

ATTENTION

Contents

Static Sensitive

Handling

Precautions Required

PIM

1

 

 

￿

 

 

 

 

 

(PA-

 

 

 

 

HUB

 

 

 

10 BASE T cable

M96)

 

 

 

￿(cross)

 

 

 

￿

 

 

 

(PA-

(PA-

 

PIM

 

HUB

 

0

HUB

M96)

 

 

 

M96)

 

 

10 BASE T cable (straight)

GT

LANI (PZ-PC19)

MAT

GT

LANI (PZ-PC19)

REAR VIEW

10 BASE T cable (straight)

to MAT

Note

: 10 BASE-T cable (for Fusion Link)

: 10 BASE-T cable (for MAT)

Note: When connecting the MAT using a HUB card, be sure to use a dedicated HUB for the MAT.

 

Figure 4-11 Overall 10 BASE-T Connections

CHAPTER 4

ND-70185 (E)

Page 44

 

Revision 3.0

 

Page 59
Image 59
NEC NEAX2400 system manual Hub