INSTALLATION
Connecting Cables
4.2Connecting 10 BASE-T Cables
Figure 4-11 shows sample cable connections, where HUB (PA-M96) cards are provided in a dual configu- ration and the FCH (PA-FCHA) card is located in PIM 1 (1-IMG system/IMG0). When HUB cards are pro- vided in a dual configuration, the two HUB cards must be connected on each front edge connector using a 10 BASE-T cross cable. However, when dual LANIs (LANI-A and LANI-B) are used for each CPU, the cross cable connection between HUBs for FCH#0 and #1 is not necessary.
Note: The Ethernet cables shown in the examples in this section are NOT available from NEC. These cables must be provided by the customer, depending on the system configuration. See “Chapter 6 Connecting 10 BASE- T Cables.”
DTI
FCH |
ATTENTION
Contents
Static Sensitive
Handling
Precautions Required
PIM | 1 |
|
| ||
|
|
|
|
| (PA- | |
|
|
|
| HUB |
|
|
| 10 BASE T cable | M96) |
|
|
| (cross) |
|
|
|
| ||
|
| (PA- | (PA- |
|
PIM |
| HUB |
| |
0 | HUB | M96) |
| |
|
| M96) |
|
|
10 BASE T cable (straight)
GT
LANI
MAT
GT
LANI
REAR VIEW
10 BASE T cable (straight)
to MAT
Note
: 10
: 10
Note: When connecting the MAT using a HUB card, be sure to use a dedicated HUB for the MAT.