INSTALLATION
Connecting Cables
ATTENTIO N
C o nte nts
S tatic S ensitive
Handling
P recautions R equired
|
| <FCH in PIM 3 (Pattern 3)> |
| <FCH in PIM 3 (Pattern 4)> |
|
|
|
| ||
|
|
|
|
|
|
| ||||
TOPU |
|
|
| TOPU |
| |||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| CN |
|
| CN |
|
|
|
|
|
|
|
|
|
|
|
|
| ||
PIM 3 |
|
|
| FCH |
| F C H | |||||
|
|
|
|
|
| ||||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| ||
PIM 2 |
|
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| FANU | ||||
|
|
|
|
|
|
|
|
|
|
|
|
PIM 1 |
| UTP CTG5 ST |
|
|
|
UTP CTG5 ST
| CN | CN |
|
| C N | CN |
|
PIM 0 | C | C |
|
| N | N |
|
| HUB | H UB |
|
|
| 00 01 02 03 04 05 06 |
|
|
| BSCM | BSCM |
LPM | UTP CTG5 ST | 00 01 02 03 04 05 06 |
|
|
| ||
|
|
| |
|
| CN |
|
|
| C N |
|
| BA SE U |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| C N |
| CN |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| ||
|
|
|
|
|
|
|
|
|
|
| PIM 3 |
| |
|
|
|
| F C H |
| FCH |
|
|
|
| |||
|
|
|
|
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
| PIM 2 |
| |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| ||
|
|
|
|
| FANU |
|
|
|
| UTP | CTG5 ST | ||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| UTP CTG5 ST |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| PIM | 1 |
| |
|
|
|
|
|
|
|
|
|
|
|
| ||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
| CN |
|
|
|
|
|
|
| CN |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| PIM 0 |
|
CN |
| C N |
CN |
| C N |
H U B |
| HU B |
| 00 01 02 03 04 05 06 | |
| C N | CN |
| UTP CTG5 ST | |
|
| |
| 00 01 02 03 04 05 LPM | |
UTP CTG5 ST |
| CN |
|
| |
| CN |
|
BASEU |
|
|
Note: When dual LANIs are used in both Slot 00 and 03 of CPR (Pattern 3 or 4), be sure to use at least two HUB cards: One HUB for internal LANI (in Slot 00) and the other for external LANI (in Slot 03). However, if this is the case and FCH is also in a dual configuration, the 10
Figure 4-16 Examples of Ethernet Cable Connection-FCH in PIM3 (1-IMG System) (2/2)
ND-70185 (E)CHAPTER 4
Page 55