Omron CPM1A operation manual Downloading Programs, Operation Procedure

Models: CPM1A

1 176
Download 176 pages 15.47 Kb
Page 144
Image 144

Handling

Section 6-3

Operation Procedure

Start

Mount the EEPROM to the

CPM1-EMU01-V1.

Connect the CPM1-EMU01-V1 to the PC’s peripheral port.

After 2 or 3 s, check if the indicator is lit green.

No

Yes

See the note on the right.

Mount the EEPROM to the CPM1-EMU01-V1 before connecting to the PC.

Check the orientation of the connector before connecting the CPM1-EMU01-V1.

Note If the indicator is not lit at all, lit red or blinks red, uploading will not be pos- sible. In this case, check the follow- ing items.

Is the connector properly con-

nected?

Select the memory area to be uploaded.

 

 

 

 

 

 

 

Upload both the ladder

 

Upload only the ladder

program and DM 6144 to

 

 

program.

DM 6655.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Is the EEPROM properly mounted?

Are the EEPROM specifications cor-

 

rect?

Are the peripheral port communica-

 

tions settings correct?

Press the UPLOAD+DM

Button.

Press the UPLOAD But- ton.

Check if the indicator is blinking green (indicating that uploading has started).

See the note above.

No

Yes

Check if the indicator is lit green (in- dicating that uploading has been suc- cessfully completed).

See the note above.

No

Yes

Remove the Expansion Memory Unit from the PC.

End

6-3-4 Downloading Programs

Ladder programs and the contents of data memory can be downloaded from the EEPROM to the PC using the procedure given below. When downloading, note the following points.

133

Page 144
Image 144
Omron CPM1A operation manual Downloading Programs, Operation Procedure