ACCULINK 317x E1 DSU/CSU

Clearing DS0 Channel Allocation

You can clear (deallocate) all the DS0 channels currently allocated to either the Network E1 interface, the DTE Drop/Insert interface, or the synchronous data ports.

To clear DS0 channel allocation,

1.Press F3 to select Cnfig from the top-level menu screen.

2.Select the configuration option set to be copied into the Edit area by using the appropriate Function key. Use the scroll keys, if necessary.

3.Press F1 to select Edit.

4.Press the key from the Edit screen to display the Chan selection.

5.Select Chan.

Edit:

Port NET Chan

F1 F2 F3

6.From the Channel Config screen, press F2 to select Clear.

Channel Config:

Dsply Clear DTE

F1 F2 F3

7.From the Clear Channel screen, select NET to clear all DS0 channels assigned to the Network E1 interface. Or, select DTE to clear all DS0 channels assigned to the DTE Drop/Insert interface. Or, select a port to clear all assignments for that data port.

Clear Channel:

 

NET

DTE

Port1

F1

F2

F3

Providing Backup Capability

If the E1 network fails, the E1 DSU/CSU provides the ability to reconfigure the unit and restore (at least partially) priority data circuits through an external backup device.

You can store backup configuration options in the Customer 2 (Cust2) set of customer-defined configuration options. The Paradyne Enterprise MIB variable devConfigAreaCopy allows the entire contents of one configuration area to be copied into another configuration area via SNMP.

By cross-connecting two synchronous data ports to each other, one port can provide a backup path for the other. As soon as the ports are configured to be mapped to each other, Data Set Ready (DSR) for the ports is turned on. The external backup device can be configured to initiate dialing when it detects the off-to-on transition of DSR.

3-32

December 1996

3170-A2-GB20-20

Page 54
Image 54
Paradyne 317x E1 manual Providing Backup Capability, Clearing DS0 Channel Allocation, Clear Channel, Port1