Paradyne 317x E1 manual Starting a Lamp Test, Abort Send or Mon

Models: 317x E1

1 167
Download 167 pages 42.72 Kb
Page 82
Image 82
Abort: Send or Mon

Maintenance

4.From the Patterns Abort screen, press the desired Function key to abort either All active test patterns, active Send test patterns, or the active Monitor (Mon) test pattern.

Patterns: Abort

All Send Mon

F1 F2 F3

If you select All, the E1 DSU/CSU terminates all active test patterns and displays the message Command Complete. Skip Step 5.

NOTE

Be careful when selecting a specific test pattern to abort. If you mistakenly choose to abort a test pattern that is not currently running, a Command Complete message still displays and the test pattern currently active still runs. You can use the TStat branch of the menu to view the test status to determine if the abort was successful.

5.From the Abort screen, press the Function key that corresponds to the network or port for which you want to abort a test pattern. Use the scroll keys, if necessary.

Abort: Send or Mon Lamp Test

NET Prt1 Prt2

F1 F2 F3

The E1 DSU/CSU terminates the selected test pattern and displays the message Command Complete.

Lamp Test

Use the Lamp Test commands to start and stop a test of the E1 DSU/CSU front panel LCD and LEDs.

Starting a Lamp Test

To start a Lamp test,

1.Press F2 to select Test from the top-level menu screen.

2.From the Test screen, press Starting a Lamp Test once to display the Lamp selection on the screen.

Test:

 

 

Rlpbk

Lpbk

Ptrns

F1

F2

F3

3. From the Test screen, press F3 to select Lamp.

Test:

 

 

Lpbk

Ptrns

Lamp

F1

F2

F3

4.From the Lamp Test screen, press F2 to select Start.

Lamp Test:

Abort Start

F1 F2 F3

3170-A2-GB20-20

December 1996

4-23

Page 82
Image 82
Paradyne 317x E1 manual Starting a Lamp Test, Abort Send or Mon