Configuration Option Tables

Select . . .

To Access the . . .

To Configure the . . .

 

 

 

Telnet Port

Telnet Session Options, Table A-7

Telnet user interface

 

 

 

SNMP

H General SNMP Management

Management support

 

Options, Table A-8

through SNMP

 

H SNMP NMS Security Options,

 

 

Table A-9

 

 

H SNMP Traps Options, Table A-10

 

 

 

 

System Options Menu

For System Options, refer to Table A-1. To access the System Options screen, follow this menu selection sequence:

Main Menu Configuration Load Configuration From System

Table A-1. System Options

Self Test

Possible Settings: Enable, Disable

Default Setting: Enable

Controls whether or not the DSU/CSU performs a self-test at power-up and after reset.

Enable ± Self-test will be performed at power-up and after a reset.

Disable ± Self-test is disabled. The DSU/CSU will still perform a few basic tests (such as memory and program checksum).

Test Timeout

Possible Settings: Enable, Disable

Default Setting: Enable

Allows user-initiated tests to end automatically. Recommend enabling when the unit is managed remotely through the FDL to avoid the requirement to terminate the test manually.

Enable ± User-initiated loopback and pattern tests end when test duration is reached.

Disable ± Tests can be terminated manually from the Network Tests screen. Refer to

Running Network Tests in Chapter 7.

NOTE: Tests commanded by the DTE or network-initiated tests are not affected by this test timeout.

Test Duration (min)

Possible Settings: 1±120

Default Setting: 10

Number of minutes for a test to be active before automatically ending.

HTest Duration (min) option appears when Test Timeout is enabled.

1 to 120 ± Amount of time in minutes for a user-initiated test to run before terminating.

A-2

March 1998

7112-A2-GB20-10

Page 78
Image 78
Paradyne 7112 manual System Options Menu, Table A-1. System Options, Self Test, Test Timeout, Test Duration min