6F8A0917

-
7
-
Table of Contents
1. Product Inspection and Storage···················································································10
1.1 Product Inspection······································································································10
1.2 Storage·······················································································································10
2. Overview···························································································································· 11
3. Names of Parts················································································································· 12
4. Installation·························································································································15
4.1 Cautionary Notes on Selecting the Installation Location············································16
4.2 How to Install the Converter·······················································································17
5. Wiring··································································································································19
5.1 Installation Cables······································································································20
5.2 External Connections ·································································································21
5.3 Cautionary Notes on Wiring························································································22
5.3.1 Cautionary Notes on Wiring between Detector and Converter······················22
5.3.2 Cautionary Notes on Wiring between Instruments and Converter·················22
5.4 Wiring Method ············································································································23
5.4.1 Terminal Treatment of Cable·········································································23
5.4.2 Cable Connection·························································································· 25
5.4.3 Grounding······································································································27
5.5 Digital I/O Connections·······························································································29
5.6 Cautionary Notes on Replacing Converter································································· 30
5.6.1 Replacing the LF230 Converter·····································································30
5.6.2 Combination with an Existing Detector (for Large Meter Size)······················31
5.6.3 Replacement of partially filled pipes type ····················································32
6. Operation·····························································································��····························· 34
7. Display and Controls ······································································································36
7.1 Names and Functions of Display and Controls ··························································37
7.2 Display Format ···········································································································40
7.3 Basic Operations
(Mode Switching, Setting Mode Operation, Total Counter Operation)························43
7.3.1 Mode Switching ·····························································································43
7.3.2 Setting Mode Operation·················································································46
7.3.3 Password Input······························································································49
7.3.4 Totalizer Operation························································································ 51
7.3.5 Maintenance Menu························································································ 53
7.4 Setting Menu List········································································································54