6F8A0917

13. Maintenance and Inspection

Do not conduct wiring work when power is applied.

Wiring while power is applied can cause electric shock.

DON’T

Do not touch the LF232 main body when high temperature fluid is being measured.

 

The fluid raises the main body

 

temperature and can cause burns

DON’T

when touched.

 

13.1Maintenance

Mag-Prover Calibration / Check

The LF232 converter has a built-in reference signal calibration and verification circuit that allows you to re-verify the original flowmeter flow lab calibration without the need for external devices. This reference signal can be used to check and adjust the circuit to perform zero and span calibration of the converter itself and for the purpose of maintenance and periodical inspection. See 9. “Mag-Prover Calibration.”

Check / Replacement of fuse

Fuse can be taken out by turning the top of the fuse holder counterclockwise. Check that the fuse is not damaged. In addition, fuse has its own life and it must to be replaced periodically. (Recommended replacement cycle is about 3 years.)

Type of fuse used: Glass tube fuse (normal blow type)

Rating:

In the case of power supply 100 to 240 VAC and 110VDC

 

1A, 250V

2 pieces

 

In the case of power supply 24VDC and 100 to 120 VAC for large meter size

 

detector

 

 

2A, 250V

2 pieces

 

In the case of power supply 24VDC for large meter size detector and 24VDC

 

for partially filled pipes detector

 

3A, 250V

2 pieces

Dimensions:

Diameter 5.2 mm × 20 mm

Check / Replacement of display unit

If the characters displayed on the LCD become thin or blots come out, the life of the LCD is reached. Replace the display unit with a new one. In order to use the display unit stably for a long time, it is preferable to replace it early. For inspection and replacement, please contact your nearest Toshiba representative.

- 157 -

Page 158
Image 158
Toshiba L5232 manual Maintenance and Inspection