General Card Replacement Guidelines

Figure 5-6. CPU Card Installation Guidelines - 7310 and 7330 Version 2

10/100BaseT Ethernet PMC

Carrier Expansion Card for Ethernet Mezzanine Card (PMC)

T3/E3 ATM Card

When installing 10/100BaseT Ethernet PMC into a Vanguard 7300 enclosure, follow these guidelines:

1)Always install the first 10/100 BaseT Ethernet PMC into the mezzanine slot of the CPU card.

2)Install subsequent 10/100 BaseT Ethernet PMC into the PMC slots on Carrier Expansion Cards.

3)Always populate the Carrier Expansion Cards in this order, PMC Slot 1 then PMC Slot 2. PMC slot 1 is the PMC slot on the right in the Vanguard 7310 Version 1; PMC slot 1 is the lower PMC slot in Vanguard 7330 Version 1.

If you are installing the Carrier Expansion card into a Vanguard 7300 enclosure, it is recommended that you follow these guidelines:

1)Always populate the Carrier Expansion card in this order, Mezzanine Slot 1 then Mezzanine Slot 2.

2)Install the first Carrier Expansion card beside the CPU Card.

3)Install subsequent Carrier Expansion cards in subsequent slots.

If you are installing the T3/E3 ATM Card with the T3/E3 ATM PMC into a Vanguard

7300 enclosure it is recommended that you follow these guidelines:

1)Install the T3/E3 ATM PMC onto the Carrier Expansion Card in position 1 only.

2)Install the T3/E3 ATM Card into the slot beside the CPU Card or the first empty slot after any Carrier Expansion Cards for Ethernet and/or before any T1/E1/PRI cards.

3)Install the T3/E3 Rear Transition Module at the same slot location as the ATM Carrier Expansion Card.

Modifying Your Vanguard 7300

5-9

Page 147
Image 147
Vanguard Managed Solutions 7300 Series CPU Card Installation Guidelines 7310 and 7330 Version, 10/100BaseT Ethernet PMC