How to Choose a Site

How to Choose a Site

Introduction

Before you install a Vanguard 7300 Series router, select a site for the device. The site

 

 

 

 

should be free of accumulated dust and environmental extremes. Refer to

 

 

 

 

Appendix A, Specifications, for detailed dimensions.

Power

 

Choose a site that is within an appropriate distance (approximately six feet) of a

Requirements

power source. Depending on your application and the country in which the Vanguard

 

 

 

 

7300 Series product is to operate, the power source must be a grounded 100 to 240 V

 

 

 

 

AC outlet, 60 to 50 Hz.

 

 

 

 

The Vanguard 7300 Series DC input version specifications are -40VDC to -72VDC

 

 

 

 

input (-48 DC version) with a maximum input current at -40VDC. See Appendix A,

 

 

 

 

Specifications, for specific electrical information.

Air and Cable

 

Allow at least 20 inches (50.7 cm.) of clearance in front of a Vanguard 7300 chassis

Clearances

to open the door, to attach cables, and to replace cards. Leave at least 20 inches

 

 

 

 

(50.7 cm) behind the unit for card removal, cable clearance, and air circulation.

 

 

 

 

Caution

 

 

 

 

Vanguard Managed Solutions 7300 series products should be used in environments

 

 

 

 

 

 

 

 

designed for computers and electronic equipment. In areas susceptible to lightning,

 

 

 

 

take precautions to prevent damage to electronic equipment. Contact your telephone

 

 

 

 

company, or an electronic accessories vendor, for information on lightning

 

 

 

 

protection equipment. Customers experiencing problems caused by surges from

 

 

 

 

lightning can eliminate such problems by installing appropriate surge suppressors on

 

 

 

 

power and data lines connected to Vanguard 7300 Series products.

Rackmount Weight

 

To avoid hazards arising from uneven mechanical loading of the rack, plan your

Consideration

installation so that (within the limitations of equipment and cabling) the weight of

 

 

 

 

the equipment is evenly distributed in the rack. Mount the heaviest units towards the

 

 

 

 

bottom of the rack.

 

 

 

 

 

3-6

Vanguard 7300 Installation

Page 80
Image 80
Vanguard Managed Solutions 7300 Series installation manual How to Choose a Site