Vanguard Managed Solutions 7300 Series installation manual Front Cover Panels

Models: 7300 Series

1 227
Download 227 pages 9.92 Kb
Page 88
Image 88

Removing And Replacing Vanguard 7300 Front Covers

Vanguard 7310 and Use the procedure in this table to remove and replace the 7310 and 7330 Version 2

7330 Version 2

front panel:

 

Front Cover Panels

 

 

 

 

 

 

Step

Action

1The front panel is held in place with a magnetic catch and can be easily removed for maintenance or recabling. Hold the two handles on the sides of the cover and pull straight out.

2Place the cover panel on a flat level surface, painted side up.

3To replace the cover, line up the cover with the front of the unit and push until the magnets hold the cover in place.

4Keep the cover on except for maintenance or recabling.

The Vanguard 7310

and 7330 Version 2

Front Cable Cover

Vanguard 7310 and 7330 Version 2 front cover panel allows cables to be routed out of the bottom, and right and left sides.

For convenience in routing cables, metal bridges are provided to secure cables with a standard wire-tie. One metal bridge is provided on the front of the chassis (top right side, above the power supplies). Additional bridges are located on the right and left hand side on the rack mounting hardware.

Use the procedure above to remove and replace the front cover panel.

Figure 3-9. Vanguard 7310 and 7330 Version 2 Cover

3-14

Vanguard 7300 Installation

Page 88
Image 88
Vanguard Managed Solutions 7300 Series installation manual Front Cover Panels, Vanguard 7330 Version Front Cable Cover