Removing and Replacing Carrier Expansion Cards and Mezzanine Cards (PMCs)

Step

Action (continued)

2Place the Carrier Expansion Card on a clean, grounded, and static-free surface.

Caution

Avoid touching areas of integrated circuitry to prevent static discharge to circuits.

3Remove the filler panel from the front of the Carrier Expansion Card by pushing it out gently from the back side of the rail.

4Position the PMC on top Carrier Expansion Card as shown in Figure 5-13.Slide the front edge connector of the PMC into the front opening from the rear.

5Place the PMC on top of Carrier Expansion Card. The connectors on the underside of the PMC should connect smoothly with the card’s J11/12/13/14 connectors.

6From the bottom of the card, insert the four short screws through the holes at the corners of the PMC and into the standoffs on the Carrier Expansion Card. Tighten the screws.

7Replace the card in the correct slot, reversing the instructions in “Removing the Carrier Expansion Card” section on page 5-19.

Figure 5-13. Installing Ethernet PMCs on the Carrier Expansion Card

Modifying Your Vanguard 7300

5-21

Page 159
Image 159
Vanguard Managed Solutions 7300 Series installation manual Installing Ethernet PMCs on the Carrier Expansion Card