Vanguard Managed Solutions 7300 Series Before You Begin, AC power cords, Checklist

Models: 7300 Series

1 227
Download 227 pages 9.92 Kb
Page 76
Image 76

Before You Begin

Before You Begin

Introduction

A Vanguard 7300 Series router comes with its CPU and other cards factory-installed.

 

The on-site installation process involves rack-mounting the unit and attaching cables

 

and AC power cords.

Installation

 

Use the checklist in this table when installing your Vanguard 7300:

Checklist

Completed

Task Description

 

 

 

Familiarize yourself with the component descriptions in Chapter 2, Vanguard 7300

 

Enclosures and Components.

 

 

 

Unpack your router and verify the shipment according to the instructions in the

 

“Checking Your Shipment Contents” section on page 3-3

 

 

 

Obtain any tools and items not supplied. See the section “Items Not Supplied”

 

section on page 3-5.

 

 

 

Select and prepare the site for installing your router. See the “How to Choose a

 

Site” section on page 3-6.

 

 

 

Review the precautions in “Thermal Considerations” on page 3-7and

 

“Electrostatic Discharge Precautions” on page 3-7.

 

 

 

Remove router covers as described in the “Removing And Replacing Vanguard

 

7300 Front Covers” section on page 3-8

 

 

 

Install your router in a rack, see the section “Installing the Vanguard 7300 in a

 

Rack” on page 3-15.

 

 

 

Attach the CTP cable according to the appropriate subsection in Cabling

 

Procedures on page 3-28.

 

 

 

Attach the power cord(s) to AC power or connect DC power according to the

 

instructions in the “Attaching a Vanguard 7300 AC Power Cord” section on

 

page 3-19and the “Connecting Vanguard 7300 DC Power” section on page 3-21.

 

Then turn the power on.

 

 

 

Ensure that the fans are operational after powering the unit on by checking to see if

 

air blows out of the unit.

 

 

 

Ensure that the ambient temperature at the fan inlet is within the temperature range

 

specified in Appendix A.

 

 

 

Connect the front interface cables according to the instructions in the “Cabling

 

Procedures” section on page 3-28.

 

 

 

Replace the router covers as described in “Removing And Replacing Vanguard

 

7300 Front Covers” section on page 3-8.

 

 

 

Connect the rear interface cables according to the instructions in the “Cabling

 

Procedures” section on page 3-28.

 

 

 

Proceed to Chapter 4, Operating Your Vanguard 7300, for power-up and node

 

configuration instructions.

 

 

3-2

Vanguard 7300 Installation

Page 76
Image 76
Vanguard Managed Solutions 7300 Series Before You Begin, AC power cords, Checklist, Completed Task Description