Dimension
Chapter 2
Hardware Installation
This chapter shows two switch installation scenarios.
2.1 Installation Scenarios
The switch can be placed on a desktop or
For proper ventilation, allow at least 4 inches (10 cm) of clearance at the front and 3.4 inches (8
cm) at the back of the switch. This is especially important for enclosed rack installations.
2.1.1Desktop Installation Procedure
Step 1. Make sure the switch is clean and dry.
Step 2. Set the switch on a smooth, level surface strong enough to support the weight of the switch and the connected cables. Make sure there is a power outlet nearby.
Step 3. Make sure there is enough clearance around the switch to allow air circulation and the attachment of cables and the power cord.
Step 4. Remove the adhesive backing from the rubber feet.
Step 5. Attach the rubber feet to each corner on the bottom of the switch. These rubber feet help protect the switch from shock or vibration and ensure space between switches when stacking.
Figure 2-1 Attaching Rubber Feet
Do not block the ventilation holes. Leave space between switches when stacking.
Hardware Installation |