Black Box 5000 Following menu will appear, After the test is initiated, the Command Facility

Models: 5000

1 268
Download 268 pages 63.91 Kb
Page 164
Image 164

Multiserver 5000

The following menu will appear:

SYNC CHANNEL LOOPBACK [TERMINATE LOOPBACK]

1.INITIATE LOOPBACK

2.TERMINATE LOOPBACK

CR - ACCEPT ENTRY

M - MAIN MENU

ENTRY:

After the test is initiated, the Command Facility

INTEGRAL DEVICE TESTS

See the 56K CSU/DSU User’s Manual for

terminal will be returned to the Command Facility

main menu. On the attached synchronous device,

information on these tests.

all characters entered will be echoed back to itself.

 

Integrity of the port and the terminal may be

 

judged by observing the quality of the returned

LED TEST

data.

This test causes all of the LED indicator lights to

The sync port must be forced-connected to another

light simultaneously for a couple of seconds and

sync port for the test to operate. Also, the attached

then they will extinguish. It is simply a test of the

device must be able to accept its own data.

indicator lights to be sure they are working. The

This test must be terminated. As long as the test is

test terminate automatically after 20 seconds.

 

in an INITIATE LOOPBACK state, the sync

 

channel will not be operational. The Command

MEMORY DUMP

Facility terminal terminates the test by reentering

the Sync Channel Loopback menu and choosing

This is reserved for dealer use only.

option 2, Terminate Loopback.

 

VOICE/FAX TESTS

 

See the Voice/Fax User’s Manual for information

 

on these tests.

 

 

 

162

Page 164
Image 164
Black Box 5000 manual Following menu will appear, After the test is initiated, the Command Facility, Data