5. Module Installation

5.1 Module Stacking Order

Although you are not actually installing the modules yet, it is important to become familiar with the five chassis positions available for modules in the Multiserver unit. These are identified from bottom to top as module locations A through E (see Figure 5-1). The possible hardware-configuration combinations are numerous. Regardless of the combination you choose, the Communications Control Module (CCM) must always be in module location A. The optional NMS module is always installed directly below the CCM. The rest of the modules should be installed in the following order, from bottom to top:

MODULE

ISU

DDS SERVICE

LINE 1

VOICE/FAX

SB M E SG R1 T1

KTS

R T

 

VOICE CHANNEL 1

OPX

6-channel CEM

12-channel CEM

Voice/fax module

RLB module

56K CSU/DSU module

Stacking is done from bottom to top without skipping a module location. For example, if you have three modules (a CCM and two optional modules), the modules should be stacked in module locations A through C with locations D and E left open. If there are four modules, module location E will be left unused.

LETTERS THAT INDICATE

MODULE LOCATION

 

 

 

 

E

 

VOICE CHANNEL 2

 

KTS

D

 

 

OPX

SB

M E SG R1 T1

R

T

 

12-CHANNEL CEM

6-CHANNEL CEM

CCM

NMS

1 2 3 4

12

12

 

 

 

 

 

 

 

 

C

 

5

6

7

8

9

10

11

12

 

 

3

 

4

 

5

 

6

 

 

 

 

 

 

 

 

 

 

 

B

 

3

 

4

 

5

 

6

 

 

115/230

 

 

 

 

 

 

 

 

A

VAC

 

 

ALARM

 

 

 

 

S1

S2

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

12345678

12345678

 

MODEM

 

G C NONC

LOG PORT

COMMAND

12345678

12345678

 

Figure 5-1. A letter on the right side of the module indicates location.

40

Page 42
Image 42
Black Box 5000 manual Module Installation, Module Stacking Order