Black Box 5000 manual CCM Board. The front-panel of the unit is to the left

Models: 5000

1 268
Download 268 pages 63.91 Kb
Page 41
Image 41

CHAPTER 4: Base-Unit Installation

 

 

 

 

J16

 

 

J13

J11

 

 

 

 

 

J14

 

 

 

PORT 6

 

 

 

 

 

BATTERY

 

 

J15

 

 

 

 

 

 

 

 

PORT 5

E1

Jumper E1

 

 

 

 

 

 

 

 

 

PORT 4

 

 

 

 

PORT 3

 

 

 

 

PORT 2

 

J17

J18

 

 

 

 

 

 

PORT 1

 

J1

J2

J3

J4

Figure 4-9. The CCM Board. The front-panel of the unit is to the left.

39

Page 41
Image 41
Black Box 5000 manual CCM Board. The front-panel of the unit is to the left