Carrier 69NT40-521, 69NT40-511-199 manual Step, Yes

Models: 69NT40-521 69NT40-511-1 69NT40-511-199

1 138
Download 138 pages 33.05 Kb
Page 74
Image 74

STEP

A

Compressor Starting Sequence

*Operating capacity is the required capacity to maintain container box temperature.

**Required voltage is a function of operating capacity and supply frequency.

B

C

YES

D

E

F

G

H

I

J

L

Is Ambient

 

 

 

NO

 

Low Speed

 

 

 

 

 

Run For 2

 

 

 

Temperature Less

 

 

 

 

 

 

Soft Start

 

 

 

 

 

Minutes

 

 

 

Than 60 ˚F ?

 

 

 

 

 

 

(See Note A & B)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

YES

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

YES

 

 

 

 

 

 

 

High Speed Start

 

 

 

 

 

 

 

 

 

 

 

 

Was Ambient Greater

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Than 60 ˚F During Start ?

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

NO

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Does High Pressure

 

 

 

 

 

 

 

 

 

 

 

 

YES

 

Is Supply Voltage

 

Switch (HPS) Trip ?

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Greater Than

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Required Voltage ** ?

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

NO

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

NO

 

 

 

 

 

NO

 

 

 

 

 

 

YES

 

 

 

 

 

 

 

 

Has Compressor Run

 

 

 

 

 

 

 

Are High Speed Switch

 

 

 

For 20 Minutes ?

 

 

 

 

 

 

 

 

 

 

 

 

 

Over Conditions Satisfied ?

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

(Refer To Steps “J & L”)

 

 

 

 

YES

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

NO

 

 

 

 

 

NO

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Has Set Point

 

 

 

 

 

 

 

 

 

 

 

 

Continue In

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Been Reached ?

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Low Speed

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

YES

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

NO

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Is The Operating Capacity *

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Below Low Speed Capacity ?

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

YES

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

NOTE A

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Is Supply Voltage

YES

 

 

 

 

 

 

 

 

During

 

compressor

 

Greater Than

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Required Voltage ** ?

 

 

 

 

 

 

 

 

 

 

 

 

 

operation, if at anytime the

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

High Pressure Switch (HPS)

 

 

NO

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

trips, the logic will switch to

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Low Speed

 

 

 

 

 

 

 

 

 

 

 

 

 

Low Speed Soft Start.

 

 

 

Soft Start (See Note B)

 

 

 

 

 

 

 

 

 

 

 

 

 

NOTE B

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Low

Speed

Soft Start

is

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

performed

by closing

the

 

Run 20 Minutes

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Continue In

 

 

 

 

 

SMV to 0% opening for ten

 

 

 

 

 

 

 

 

Low Speed

 

 

 

 

 

seconds during the start-up

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

of the compressor. The SMV

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

opening is

then gradually

 

Is Supply 3 ˚F Above Set Point

NO

 

 

 

 

 

 

 

 

 

 

 

 

increased to the desired value

 

Or Is Operating Capacity *

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Greater Than Low Speed Capacity ?

 

 

 

 

 

 

 

 

at the rate of a 3% opening

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

per second.

 

 

 

 

 

 

YES

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Figure 3-6. Two-Speed Compressor Speed Change Logic -- Perishable Range Only

T-268-07

3-36

Page 74
Image 74
Carrier 69NT40-521, 69NT40-511-199 manual Step, Yes