Installing the server | Mounting the server in the rack |
3 x
3 x
Figure 2: Mounting the carrier rails
ÊSecure the two telescopic carrier rails to the left and the right inside the rack using the Allen key no. 5 supplied. Note that there is a left and right carrier rail which differ in the arrangement of the tap holes. The figure shows the left carrier rail. When mounting the carrier rails, the guide nabs of the rails next to the spring nuts must fit into the holes of the support uprights.
Figure 3: Mounting the telescopic rails onto the carriers
ÊFirst of all screw the fastening screws onto the telescopic rails
21 |