Built-In Self Test (BIST)

4.9.9IPMB Bus Busy/Not Ready Test

The objective of the test is to identify any potential FPGA lockup before loading the BlueCat. When the FPGA is detected to be locked up, an event indicating which bus actually failed is logged into the Event log.

38MPCMM0001 Chassis Management Module Software Technical Product Specification

Page 38
Image 38
Intel MPCMM0001 manual Ipmb Bus Busy/Not Ready Test