CHAPTER 4
Site Preparation
•Site Preparation Checklist for EX2200 Switches on page 33
•General Site Guidelines for EX Series Switches on page 35
•Site Electrical Wiring Guidelines for EX Series Switches on page 35
•Environmental Requirements and Specifications for EX Series Switches on page 36
Site Preparation Checklist for EX2200 Switches
The checklist in Table 15 on page 33 summarizes the tasks you need to perform when preparing a site for EX2200 switch installation.
Table 15: Site Preparation Checklist
Item or Task
Environment
Verify that environmental factors such as temperature and humidity do not exceed switch tolerances.
For More Information | Performed By | Date |
“Environmental Requirements and Specifications for EX Series Switches” on page 36
Power
Measure distance between external power sources and switch installation site.
Locate sites for connection of system grounding.
Calculate the power consumption and | “Power Specifications for EX2200 |
requirements. | Switches” on page 47 |
Hardware Configuration |
|
Choose the number and types of switches you | “EX2200 Switches Hardware |
want to install. | Overview” on page 3 |
Rack or Cabinet |
|