Complete Hardware Guide for EX2200 Ethernet Switches
Table 15: Site Preparation Checklist (continued)
Item or Task | For More Information | Performed By | Date |
Verify that your rack or cabinet meets the | “Rack Requirements for EX2200 |
|
|
minimum requirements for the installation of | Switches” on page 39 |
|
|
the switch. |
|
|
|
| “Cabinet Requirements for EX2200 |
|
|
| Switches” on page 40 |
|
|
Plan rack or cabinet location, including required | “Clearance Requirements for Airflow |
|
|
space clearances. | and Hardware Maintenance for |
|
|
| EX2200 Switches” on page 42 |
|
|
Secure the rack or cabinet to the floor and |
|
|
|
building structure. |
|
|
|
Wall |
|
|
|
Verify that the wall meets the minimum | “Requirements for Mounting an |
|
|
requirements for the installation of the switch. | EX2200 Switch on a Desktop or Wall” |
|
|
| on page 42 |
|
|
Verify that there is appropriate clearance in your | “Clearance Requirements for Airflow |
|
|
selected location. | and Hardware Maintenance for |
|
|
| EX2200 Switches” on page 42 |
|
|
Cables |
|
|
|
Acquire cables and connectors: |
|
|
|
•Determine the number of cables needed based on your planned configuration.
•Review the maximum distance allowed for each cable. Choose the length of cable based on the distance between the hardware components being connected.
Plan the cable routing and management.
Related | • | General Safety Guidelines and Warnings for EX Series Switches on page 113 |
Documentation | • | General Site Guidelines for EX Series Switches on page 35 |
|
• Installing and Connecting an EX2200 Switch on page 51
• Mounting an EX2200 Switch on page 53