Table15: Site Preparation Checklist (continued)

DatePerformedByFor More InformationItem or Task

“RackRequirements for EX2200
Switches”on page 39
“CabinetRequirements for EX2200
Switches”on page 40
Verifythat your rack or cabinet meets the
minimumrequirements for the installation of
theswitch.
“ClearanceRequirements for Airflow
andHardware Maintenance for
EX2200Switches” on page 42
Planrack or cabinetlocation, including required
spaceclearances.
Securethe rack or cabinet to the floor and
buildingstructure.

Wall

“Requirementsfor Mounting an
EX2200Switch on a Desktopor Wall”
onpage 42
Verifythat the wall meets the minimum
requirementsfor the installation of the switch.
“ClearanceRequirements for Airflow
andHardware Maintenance for
EX2200Switches” on page 42
Verifythatthere is appropriate clearancein your
selectedlocation.

Cables

Acquirecables and connectors:
Determinethe number of cables needed
basedon your planned configuration.
Reviewthe maximum distance allowed for
eachcable.Choose the length of cable based
onthe distance between the hardware
componentsbeing connected.
Planthe cable routing and management.
Related
Documentation
GeneralSafety Guidelines and Warnings for EX Series Switcheson page 113
GeneralSite Guidelines for EX Series Switches on page 35
Installingand Connecting an EX2200 Switch on page 51
Mountingan EX2200 Switch on page 53
Copyright© 2010, Juniper Networks, Inc.34
CompleteHardware Guide for EX2200 Ethernet Switches