November 2006Preparing for installation
Step | Description | Check |
|
|
|
6 | Set the following: | ❒ |
SCSI IDs on the
DIP switches on the
device termination on the
7 | Insert the 201i server into two consecutive slots inside the | ❒ | |
| switch. For instructions, see: |
| |
| | large Meridian 1 systems, such as Option 51C (see page |
|
|
| 56) |
|
| | Option 11C or Option 11C Mini (see page 72) |
|
| | Succession 1000 (see page 107) |
|
|
|
| |
8 | Install the MPC cards, if required (see page 140). | ❒ |
201i Server Hardware Installation | 39 |