To unpack the 201i server

41

To prepare the 201i server for installation in a Meridian 1 switch ...

52

To position the 201i server on the switch shelf

56

To remove the backplane cables

59

To install the NTRH3501 backplane cable

63

To install the SCSI cables for Meridian 1

68

To position the 201i server on the switch shelf

72

To install the cable

81

To install the NTRH3502 SCSI cable

88

To connect the cables

92

To remove the front bezel and inside front cover plate

104

To install the 201i server inside the Media Gateway or Media

 

Gateway Expansion

108

To install the NTRH3502 cable

111

To replace the inside front cover plate

114

To replace the front bezel

116

To connect the cables

117

To install the MPCs

140

To connect the monitor, keyboard, and mouse

143

To connect the CD-ROM and tape drives to the 201i server

 

(Meridian 1)

145

To connect the CD-ROM and tape drives to the 201i server

 

(Option 11C)

147

To connect the CD-ROM and tape drives to the 201i server

 

(Option 11C Mini)

149

To connect the CD-ROM and tape drives to the 201i server

 

(Succession 1000)

151

To establish the switch and network connections

153

To connect the modem

156

To complete the installation and start the 201i server

159

201i Server Hardware Installation

9

Page 9
Image 9
Nortel Networks 201i manual Task List