Preparing for installation

Installation checklist

The following checklist identifies the steps required to install the 201i server and peripheral devices. For more details, see Chapter 8, “Connecting peripheral devices to the 201i server.”

WARNING

Risk of personal injury and hardware failure

The power outlets used by the CallPilot server and its peripheral devices must be connected to the same ground reference as the one used by the Meridian 1 switch or Succession 1000 system with MGate cards (NTRB18CA) connected to the CallPilot server. If this requirement is not met, power transients can cause personal injury and hardware failure.

Step

Description

Check

 

 

 

1

Ensure that you have reviewed the “Installing CallPilot”

 

section in the CallPilot Installation and Configuration Task

 

 

List and completed stage 1 of the “Installation checklist.”

 

 

This includes the following tasks:

 

 

„ Unpack the server, and ensure you have all the items you

 

need (see page 41).

 

 

Complete the following checklists that are provided in

 

 

the CallPilot Installation and Configuration Task List:

 

 

— “CallPilot software media and documentation

 

 

checklist”

 

 

— “CallPilot server hardware checklist”

 

 

„ Inspect the server for any damage that might have

 

occurred during shipping (see page 41).

 

201i Server Hardware Installation