Table C. Power Cable Termination Requirements

Powerware 9315 SSBM Model: 2500 and 3000

 

 

 

 

 

Tightening

Bolt/Int.

 

 

 

 

Number of Cable

Torque

Hex Size

Terminal Function

Terminal

Function

 

Connections per Bus

N-M (lb-ft)

(In.)

AC Input from UPS

E8

Phase A

14

--- 2 bolt mounting

76 (56)

1/2

Output to SSBM

 

 

 

 

 

 

E9

Phase B

14

--- 2 bolt mounting

76 (56)

1/2

 

 

 

 

 

 

 

 

E10

Phase C

14

--- 2 bolt mounting

76 (56)

1/2

 

 

 

 

 

 

 

 

E4

Neutral

24

--- 2 bolt mounting

76 (56)

1/2

 

 

 

 

 

 

 

 

Frame

Ground

24

--- 1 bolt mounting

76 (56)

1/2

 

Ground

 

 

 

 

 

 

AC Input to SSBM

E1

Phase A

12

--- 2 bolt mounting

76 (56)

1/2

Bypass

 

 

 

 

 

 

E2

Phase B

12

--- 2 bolt mounting

76 (56)

1/2

 

 

 

 

 

 

 

 

E3

Phase C

12

--- 2 bolt mounting

76 (56)

1/2

 

 

 

 

 

 

 

 

E4

*Neutral

24

--- 2 bolt mounting

76 (56)

1/2

 

Frame

Ground

28

--- 1 bolt mounting

76 (56)

1/2

 

Ground

 

 

 

 

 

 

AC Input to

E11

Phase A

14

--- 2 bolt mounting

76 (56)

1/2

optional SMB

 

 

 

 

 

 

E12

Phase B

14

--- 2 bolt mounting

76 (56)

1/2

Bypass

 

 

 

 

 

 

E13

Phase C

14

--- 2 bolt mounting

76 (56)

1/2

(Separate Feed)

 

 

 

 

 

 

E4

*Neutral

24

--- 2 bolt mounting

76 (56)

1/2

 

 

Frame

Ground

24

--- 1 bolt mounting

76 (56)

1/2

 

Ground

 

 

 

 

 

 

AC Output from

E5 (E15)

Phase A

12 (14) --- 2 bolt mounting

76 (56)

1/2

SSBM or Optional

 

 

 

 

 

E6 (E16)

Phase B

12 (14) --- 2 bolt mounting

76 (56)

1/2

SMB to Critical

 

 

 

 

 

 

E7 (E17)

Phase C

12 (14) --- 2 bolt mounting

76 (56)

1/2

Load

 

 

 

 

 

 

E4

*Neutral

24 (24) --- 2 bolt mounting

76 (56)

1/2

 

 

Frame

Ground

20 (24) --- 1 bolt mounting

76 (56)

1/2

 

Ground

 

 

 

 

 

 

AC Output from

A

Phase A

12

--- 2 bolt mounting

76 (56)

1/2

SSBM to Load

 

 

 

 

 

 

B

Phase B

12

--- 2 bolt mounting

76 (56)

1/2

Bank

 

 

 

 

 

 

C

Phase C

12

--- 2 bolt mounting

76 (56)

1/2

 

 

E4

*Neutral

24

--- 2 bolt mounting

76 (56)

1/2

 

Frame

Ground

28

--- 1 bolt mounting

76 (56)

1/2

 

Ground

 

 

 

 

 

 

NOTES: * = These neutral bolt mountings are only available on SSBMs or SSBMs with SMBs rated as 3P/4W.

DESCRIPTION:

INSTALLATION NOTES

DRAWING NO:

164201373---1

SHEET: 3 of 6

 

 

 

A---4

Powerware 9315 Parallel Capacity/Redundant System with PHP SSBM

 

164201373 Rev. A 092402

Page 160
Image 160
Powerware 9315s manual AC Input from UPS