
Table of Contents
Introduction | i |
Basic System Configurations | iii |
Using This Manual | iv |
Conventions Used in This Manual | v |
Safety Considerations | vi |
For More Information | vii |
Getting Help | viii |
Section I | Installation |
| ||
1 | Getting Started | |||
| 1.1 | Installing the UPS | ||
| 1.1.1 | Creating an Installation Plan | ||
| 1.1.2 | Preparing Your Site | ||
| 1.1.3 | Environment Considerations | ||
| 1.1.4 | Preparing for Wiring the Parallel Capacity/Redundant System | ||
| 1.1.5 | Inspecting and Unpacking Each Cabinet | ||
2 | Installing the Parallel Capacity/Redundant System | |||
| 2.1 | Preliminary Installation Information | ||
| 2.2 | Installing the Switchboard System Bypass Module | ||
| 2.3 | Installing Optional System Maintenance Bypass (SMB) | ||
| 2.4 | Installing the Powerware Static Switch | ||
| 2.4.1 | Installing a Fully Rated Static Switch (4000A) | ||
| 2.5 | Installing SSBM or SMB Circuit Breakers | ||
| 2.5.1 | Installing an SSBM or SMB Circuit Breaker | ||
| 2.5.2 | Setting the Power+ Trip Unit | ||
| 2.6 | Installing UPM Cabinets | ||
| 2.7 | Installing SSBM Wiring | ||
| 2.8 | Installing Optional SMB Wiring | ||
| 2.9 | Preparing for Installing Optional Accessories | ||
| 2.10 | Initial Startup | ||
| 2.11 | Completing the Installation Checklist | ||
| 2.12 | Installation Checklist | ||
3 | Installing a Remote EPO Control | |||
4 | Installing a Remote Monitor Panel | |||
5 | Installing a Relay Interface Module | |||
6 | Installing a Supervisory Contact Module |
Powerware 9315 Parallel Capacity/Redundant System with PHP SSBM | iii | |
164201373 Rev. A | 092402 |
|