NOTE: Before installing an RMP, be sure you have prepared the SSBM according to the instructions in Chapter 2.

4.2To install an RMP:

1.Securely mount the RMP(s).

2.Install wiring from the RMP using ½-in. conduit through the cable entry panels in the top of the SSBM control section (refer to the enclosed switchboard vendor drawings for the location of the conduit landing plate).

3.In the spare parts kit, locate the RMP adapter cable assembly

(see Figure 4---2). Mate the DB---9 connector on the back of the terminal block to the DB---9 connector (Port 1) on the Customer Interface Panel of the SSBM (refer to Drawing 164201373---4 in Appendix A). Use two screws from the spare parts kit to secure the terminal block bracket to the Customer Interface Panel.

Connect to

Port 1 (DB---9) on

Customer Interface Panel

FUSE

TERMINAL

BLOCK (TB3)

Figure 4---2. Terminal Block Bracket

Powerware 9315 Parallel Capacity/Redundant System with PHP SSBM

4--3

164201373 Rev. A 092402

 

Page 41
Image 41
Powerware 9315s manual To install an RMP, Fuse Terminal Block TB3