
UPM
INPUT
UPM1
BATT
UPM2
BATT
UPM3
BATT
UPM4
BATT
| BYPASS | MAINTENANCE | |
| BYPASS | ||
| INPUT | ||
| INPUT | ||
|
|
| |
SSBM |
|
|
|
| FBP |
|
|
CBP |
|
|
|
(open) | SS |
|
|
|
|
| |
CBS |
|
| |
| LBB |
|
|
TEMP. TABS |
|
| |
SMB |
|
|
|
| MIS | MBP |
|
| (open) |
|
|
TO TEMPORARY LOAD
BANK (BY OTHERS)
Path of Electrical Power
OUTPUT TO
CRITICAL
LOAD
Figure 7---5. Path of Current Through the Parallel Capacity/Redundant System
in Load Bank Mode with SSBM/SMB with Temporary Load Bank Tabs.
Powerware 9315 Parallel Capacity/Redundant System with PHP SSBM | |
164201373 Rev. A 092402 |
|