![](/images/new-backgrounds/1188787/188787119x1.webp)
UPM
INPUT
UPM1
BATT
UPM2
BATT
UPM3
BATT
UPM4
BATT
BYPASS
INPUT
SSBM
FBP
CBP
(open)
SS
CBS
TEMP. TABSLBB
OUTPUT TO
CRITICAL LOAD
TO TEMPORARY LOAD
BANK (BY OTHERS)
Path of Electrical Power
Figure 7---4. Path of Current Through the Parallel Capacity/Redundant System
in Load Bank Mode with SSBM with Temporary Load Bank Tabs.
Powerware 9315 Parallel Capacity/Redundant System with PHP SSBM | |
| 164201373 Rev. A 092402 |