3Com S330 manual General Installation Procedure

Models: S330

1 262
Download 262 pages 1.1 Kb
Page 42
Image 42

30CHAPTER 2: INSTALLATION

Installation Overview Figure 3 summarizes the overall installation procedure for the PathBuilder S330/S310.

Figure 3 General Installation Procedure

Prepare the Site:

Verify clearance around the shelf site

Fabricate and run cabling and wiring

Step 1 (optional)

Install the optional modules

Step 2

Install the unit in the rack

Step 3

Connect AC or DC power and (optionally) the RPS system

Step 4

Connect I/O cabling and wiring

Step 5

Connect the management terminal

Page 42
Image 42
3Com S330 manual General Installation Procedure