3Com S330 manual Installing the Optional RPS System, Shelf Fill for AC/DC Power Application

Models: S330

1 262
Download 262 pages 1.1 Kb
Page 51
Image 51

Installation Procedures

39

CAUTION: CENTRALIZED 48VDC UNITS -To be installed only in Restricted Access Areas (dedicated equipment rooms, equipment closets, etc.) in accordance with Articles 110-16 or 110-17, and 110-18 of the National Electrical Code, ANSI/NFPA No.70.

1Turn off the AC/DC power source and connect the AC/DC leads to the front of the shelf. Dress the leads to the rack, leaving a service loop.

2Turn on AC/DC power and verify that the POWER indicator on the power supply is on and that the fans are running. Figure 15 shows the shelf fill for the AC/DC power application.

Figure 15 Shelf Fill for AC/DC Power Application

AC Units Only:

AC Power Connector / Fuse Holder

Redundant Power Supply (RPS) Connector

VentVent

DC Units Only:

DC Power Connector

+

GND

Installing the Optional RPS System

The PathBuilder S330/S310 also supports the SuperStack II Redundant Power Supply (RPS). Figure 15 above shows the location of the RPS. Only connect a 3Com RPS, option 3C16073, to this socket. For details, follow the installation instructions in the guide accompanying the RPS.

Page 51
Image 51
3Com S330 manual Installing the Optional RPS System, Shelf Fill for AC/DC Power Application