3Com manual Receiving, Inspecting PathBuilder S330/S310

Models: S330

1 262
Download 262 pages 1.1 Kb
Page 41
Image 41

2

INSTALLATION

This chapter tells you how to mechanically and electrically install SuperStack® II PathBuilder® S330 and SuperStack® II PathBuilder® S310 WAN access switches (PathBuilder S330/S310) in your network and describes the PathBuilder S330/S310 ports and modules. It contains the following sections:

Receiving and Inspecting the PathBuilder S330/S310

Installation Overview

Installation Procedures

Before using this chapter for an actual installation, read through it at least once to familiarize yourself with the overall process.

Receiving and

When you receive the PathBuilder S330/S310, do the following:

Inspecting the

 

PathBuilder S330/S310

 

1Unpack and inspect the PathBuilder S330/S310 equipment for any damage that might have occurred during shipment.

2Inventory the equipment against the shipping notice.

3Save the boxes and packing materials in the event there is damage or in case you need to reship the unit at a future date.

4If anything is damaged or missing, contact the shipper and 3Com immediately.

CAUTION: Many of the integrated circuits on the modules are sensitive to static electricity. Do not remove the plug-in modules from their shelves without wearing a properly-grounded antistatic wrist strap.

Page 41
Image 41
3Com manual Receiving, Inspecting PathBuilder S330/S310