Installation Procedures | 37 |
5Replace the unit’s cover.
a Slide the cover back into place so that the five tabs go under the lip of the front panel (arrow 1) and push it down at the rear (arrow 2), as shown in Figure 13.
Figure 13 Replacing the PathBuilder S330/S310 Cover
2
1
bSecure the cover with the eight assembly screws you removed in step 1a.
Step 2: Install the Unit in In a normal rack mount configuration the PathBuilder S330/S310 shelf is 3.5" x the Rack 17" x 15.5" including cables. Since the equipment is cooled with two internal
fans, clearance at the top is not needed; however, convection cooled equipment must not be mounted directly under the shelf.Allow at least one rack unit clearance below the unit. See Figure 14 for details. If the PathBuilder S330/S310 is mounted in an enclosure, plan on enough clearance at the front for cable and wiring service loops.
CAUTION: Many of the integrated circuits on the modules are sensitive to static electricity. Do not handle the
To mount the shelf, follow these steps:
1Attach the
CAUTION: When attaching the
2Adjust the
CAUTION: Do not block the ventilation openings on the top and bottom of the unit during installation. A minimum of 1 rack unit (1.75”) space is required.